loading

Talking about the precautions for the installation of high pole lights solar street light-litelsolar manufacturers

by:Litel Technology     2022-05-21
Preparing for installation of high pole lights 1. Carefully count all components according to the loading and packing list. 2. Check the components for damage, bending, twisting, and damage to the zinc layer. 3. The placard on each section of the rod indicates the type of rod, order number, and number of sections. The weight of the rod body is marked with a colored pen on the inside of the rod body. Check whether the delivery is correct and whether the lifting capacity of the crane is sufficient. 4. According to the large and small socket lengths provided on the drawing, mark the rod body for use in socketing. Install 1. Each splice is provided with a socket length, but due to the influence of manufacturing, installation errors and physical factors, there are changes in the socket length, so a large socket length and a small socket length are provided. 2. To facilitate installation, it may be necessary to lubricate the mating surfaces. Be careful not to use lubricating oil to prevent leakage and contamination of the rod body. You can lubricate the inner and outer surfaces of the sleeve with soapy water. 3. When socketing, apply the necessary force at both ends to obtain a tight socket.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...