1. The poles, lamp panels, wiring, and lifting and lowering motor mechanisms of mid-pole lamps and high-pole lamps should comply with the current industry standard 'Technical Conditions for High-Pole Lighting Facilities' (CJ/T3076-1998). Structure of medium and high pole lighting facilities. 2. Three-phase power supply should be used for mid-pole lights and high-pole lights, and the three-phase load should be evenly distributed, and protection devices must be installed in each circuit. 3. Stakes should be provided for the top elevation of the foundation. 4. The excavation depth and size of the foundation pit shall comply with the design regulations. The allowable deviation of the depth of the foundation pit should be ten 100mm, -50mm. When the deviation between the foundation pit depth and the designed pit depth is more than 100mm due to soil quality reasons, it should be handled according to the following regulations: (1) When the deviation is +100mm and -50mm, stone paving and grouting should be used. (2) When the deviation exceeds +300mm of the specified value, the part exceeding +300mm can be tamped with soil or sand or stone. Then use paving stone grouting treatment. 5. The length of the anchor bolts buried in the concrete should be greater than 20 times its diameter, and should be welded firmly with the main reinforcement. The anchor bolts should be removed from rust, and the threaded part should be protected. The diameter of the center of the flange holes should be the same, and the deviation should be smaller than that of the bolts. Double nuts and spring washers should be used. 6. The formwork for pouring concrete should be made of steel formwork. The surface should be flat and the joints should be tight. The formwork should meet the requirements of the design size of the foundation. Before the concrete is poured, the surface of the formwork should be coated with a release agent. 7. When pouring the foundation, it should comply with the relevant provisions of the current national standard 'Code for Design of Concrete Structures' (GB50010-2002). 8. The backfill of the foundation pit shall meet the following requirements: (1) For soil suitable for compaction, compaction shall be carried out once every 300mm of backfill thickness, and the compaction degree shall reach 80% of the compactness of the original soil. (2) For the water-saturated viscous soil that is not suitable for compaction, it should be filled in layers, and the density of the backfill should reach 80% of the original soil. We mainly produce and sell outdoor road, square, station, wharf, courtyard and indoor industrial and mining lighting fixtures. Varieties are:
solar street light,
led street light, single-arm light, double-arm light, high pole light, combination light, garden light, landscape light, lawn light, buried light, solar light, led light, led lamp holder, solar panel, Fountain sculptures, various traffic sign poles, traffic lights, power poles, and supporting ballasts and triggers, and also produce light-controlled and time-controlled switch boxes.
solar lights are among the best and the long known , which plays an essential part in automatic manufacturing.
With continuous operational improvements, expanding capacity and a strong competitive position for serving strategic domestic markets, Guangzhou Litel Technology Co.,Ltd. are positioned for long-term growth that will benefit our customers and investors.
To ensure desired results, it is very essential that you get the right kind of from a certified provider..
As a top provider of products, Guangzhou Litel Technology Co.,Ltd. will surely meet your urgent need for solar lights solutions. Go to Litel Technology.