1. Foundation pouring 1. Determine the position of the standing lamp; investigate the geological conditions, if the surface 1 m 2 is all soft soil, then the excavation depth should be deepened; at the same time, it should be confirmed that there are no other facilities (such as cables, pipes, etc.) below the excavation position, There is no long-term shading object on the top of the street lamp, otherwise the position should be changed appropriately. 2. Reserve (excavate) a pit that meets the standard at the position of the vertical lamp (design depth according to the height of the lamp pole); carry out the positioning and pouring of the pre-embedded parts. The embedded parts are placed in the center of the square pit, one end of the PVC threading pipe is placed in the center of the embedded parts, and the other end is placed in the battery storage place. Pay attention to keep the embedded parts, foundation and the original ground on the same level (or the top of the screw and the original ground on the same level, according to the needs of the site), and one side should be parallel to the road; only in this way can the rear end of the light pole be erected and Not skewed. Then it is fixed with C20 concrete. During the pouring process, the vibrating rod should not be used to vibrate to ensure the overall compactness and firmness. 3. After the construction is completed, clean up the residual sludge on the positioning plate in time, and use waste oil to clean the impurities on the bolts (the bolts can be wrapped with tape before construction to prevent too many magazines from adhering to it, which will affect the installation progress). 4. During the solidification process of the concrete, it is necessary to water and maintain it regularly; the chandelier can only be installed after the concrete is completely solidified (generally more than 72 hours). 2. Lamp installation 1. Fix the components of each part: the solar panel is fixed on the solar panel bracket, the lamp head is fixed on the pick arm, then the bracket and pick arm are fixed to the main pole, and the connecting wire is routed to the control box (battery box). 2. Before lifting the lamp pole, check whether the fasteners of each part are firm, whether the lamp head is installed correctly, and whether the light source works normally. Then check whether the operation of the simple debugging system is normal; loosen the connecting wire of the solar panel on the controller, the light source works; connect the connecting wire of the solar panel, the light is off; at the same time, carefully observe the changes of the indicators on the controller; everything is normal, Lift installation. 3. When the main light pole is lifted, pay attention to safety precautions; the screws are absolutely fastened, if the sun angle of the component is deviated, it needs to be adjusted upward to the sun direction to be completely south. 4. Put the battery into the battery box, and connect the cable to the controller according to the technical requirements; connect the battery first, then the load, and then the solar panel; when wiring, be sure to pay attention to the wiring and the terminals marked on the controller Can not be wrongly connected, positive and negative polarities can not collide, can not be reversed; otherwise the controller will be damaged. 5. Check whether the system is working normally; loosen the solar panel cable on the controller, the light is on; connect the solar panel cable at the same time, the light is off; then carefully observe the changes of the indicator lights on the controller; everything is normal before it can be sealed Good control box. 3. Installation of the battery 1. When the battery is placed in the waterproof box, it must be handled with care to prevent damage to the waterproof box; 2. After the output line is connected to the battery, short-circuiting is prohibited under any circumstances to avoid damage to the battery; 3. The battery When the output line is connected to the controller in the utility pole, it must pass through the PVC threading pipe; 4. After the above is completed, check the wiring of the controller end to prevent short circuit. Close the door of the control box after it is normal. 4. Installation of solar cell modules 1. Measures must be taken to avoid short circuit before the output positive and negative poles of the solar cell panel are connected to the controller; 2. The solar cell module and the bracket must be connected firmly and reliably; 3. The output line of the module should be avoided Exposed and fastened with a cable tie; 4. The orientation of the battery assembly should be due south, and the compass shall prevail. 5. Precautions If the user installs lamps on the ground by himself, the precautions are as follows: 1. Solar street light uses solar radiation as energy. Whether the sunlight irradiating on the photovoltaic modules is sufficient or not directly affects the lighting effect of the lamps, so choose the installation location of the lamps. When the solar cell module is exposed to sunlight at any time, there are no obstructions such as leaves. 2. When threading, be careful not to clamp the wire at the connection of the light pole. The connection of the wire should be firmly connected and wrapped with PVC tape. 3. During use, in order to ensure the appearance and the battery components can better receive solar radiation, please clean the dust on the battery components once every six months, but do not rinse with water from bottom to top.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...